ARGO ENVIRONMENTAL ENGINEERING LIMITED

 

SERVICES

Flare Gas IgnitionFlare Gas ReductionHC Gas BlanketingFlare Tip ChangeoutWater Cleaning

CONTACTS

AEEL 

 
HOME PRODUCTS CONTACT US CD-ROM DOWNLOADS LINKS
 

 

Flare Tip Change-out

Change-out your Flare the Fastest and Safest Way

In partnership with Vertech Offshore AS (formally Statnett) we offer the most experienced team of  Offshore Flare Tip Change out specialists.  Over 150 operations completed without any accidents and usually completed in 1 day.

 

Flare Mechanical Handling Systems

The Vertech Installation method involves the use of a helicopter and special long line lifting techniques that enable SAFE lifting of  flares up to 4.5 tonnes with a standard Super Puma.

 

 

Services available include:

  • Full design and HAZOP service

  • Operations manuals

  • Machanical team of qualified abseilors

  • Unrivelled safety record

  • Fastest system - installation usually completes within 6 hours

 

Since 1991

106 platforms/FPSO's/facilities visited

134 flare tips fitted or replaced

14 other components fitted (including flare decks)

13 other services supplied

ZERO LOST-TIME ACCIDENTS

In 2005, Vertech Offshore AS have been able to offer an increased lifting capacity up to 9 tonnes by using the Sikorsky S-64 derived 'Skycrane'.

Visit our Download Centre to see videos and brochures or contact us for copies on CD Rom